Machine Hall with Open Utility Extension

A modern machine hall was built in Haren, featuring a span of 18.5 m and a length of 24 m. The insulated hall was pre-configured for future photovoltaic installation, based on the client’s request. A particularly practical feature is the attached open utility section, which offers additional storage or usage space with natural ventilation. The entire structure is coated with MenColor in RAL 7016 – durable, robust, and functional.

0 59 32 / 72 20 0